Quantcast

Sangamon Sun

Monday, November 25, 2024

Village of La Grange Design Review Commission met August 7

Shutterstock 435159994

Village of La Grange Design Review Commission met Aug. 7.

Here is the agenda provided by the commission:

I. CALL TO ORDER AND ROLL CALL:

A meeting of the Design Review Commission was convened at 7:36 p.m.

Present: (and constituting a quorum): Commissioners Banks, Cahill, Dunne, and Wisthuff.

Absent: Chairman Reardon, Commissioners Hanson and McClinton.

Also Present: Mimi and Dan Collins of Anecdote Home, and Village Planner Heather V alone.

As Chairman Reardon as absent, a Pro Tem Chairperson for the evening was needed. Commissioner Whisthuff was elected unanimously to act as the Pro Tem Chairperson, on a motion by Commissioner Banks and seconded by Commissioner Cahill.

III. BUSINESS AT HAND:

DRC #110 DESIGN REVIEW PERMIT FOR ANECDOTE HOME, 8 WEST BURLINGTON AVENUE

Pro Tem Chairman Wisthuff introduced the application.

Mimi Collins presented the application and requests. She described the proposed furniture and home furnishings business as well.

Pro Tem Chairman Whithuff asked how the overhang was going to be filled in with the black metal.

Ms. Collins described how the overhang will be filled on all three sides with the same black metal material as is currently on the building. The black material will be flush with the second floor limestone bump out.

Commissioner Banks asked about the proposed goose neck lighting. Discussion ensued regarding other buildings with goose neck lighting.

Pro Tem Chairman Wisthuff confirmed that the enclosure of the overhang would be weather tight.

Ms. Collins said that was correct.

Commissioner Banks asked about the electrical connection for the goose neck lighting. Ms. Collins stated that there is existing electrical that can be extended. 

Commissioner Cahill indicated support for the application.

Design Review Commission Recommendation

A motion was made by Cahill, seconded by Banks to recommend the application

A roll call vote was taken

Ayes: Banks, Cahill, Dunne, and Wishuff 

Nays: 

Motion passed

Ms. Valone said that the application could be placed on the August 26 Village Board agenda.

  1. NEW BUSINESS

    None.

  2. OLD BUSINESS

    None.

  3. ADJOURNMENT:

    There being nothing further to come before the Design Review Commission, on motion by Commissioner Cahill and seconded by Commissioner Dunne, the Design Review Commission meeting of August 7 2019, was adjourned at 7:46 p.m.

https://www.villageoflagrange.com/ArchiveCenter/ViewFile/Item/2316

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate